Refit & new build oversight
Someone on site who understands the work, has no relationship with the yard, and tells you what is actually happening to your boat.
A refit is the point at which an owner has least control and most exposure. A new build is the same exposure stretched across many months, with the added difficulty that there is no boat to inspect until a great deal of money has already been committed. In both cases the yard is busy. Several trades are working to their own schedules. Decisions get taken on the shop floor because somebody needed an answer that morning. And unless there is someone present who knows what they are looking at, the first the owner hears of any of it is the invoice.
Oversight is not about distrust. Most yards do good work. It is about the owner having their own technically competent eyes on the project — so that questions get asked while they are still cheap to answer.
What tends to go wrong
These are the recurring ones, and none of them require anybody to be acting in bad faith:
- Sequencing — work done in the wrong order, so something finished has to be opened up again
- Scope drift — extras agreed verbally on site, priced later, and queried only when the final account arrives
- Substitution — a different material or component fitted because the specified one had a lead time, without the owner being asked
- Hidden work — the standard of what is behind a panel or under a sole board, closed up before anyone independent has seen it
- Sign-off pressure — final payment requested against a list nobody has verified against the boat
- Specification drift — on a new build, a boat delivered to a standard that is not quite the one ordered, noticed at handover when the leverage has gone
Before the work starts
On a new build this is the contract and the specification: what is actually included, how each milestone is defined, what happens to the delivery date if it slips, and whether the payment schedule matches the build sequence rather than the yard's cash flow. On a refit, the scope of works is reviewed against the vessel and against the quotation: whether what has been priced is realistic, whether anything obvious has been missed, whether the sequence of trades makes sense, and whether the specification is precise enough to hold a contractor to. Most disputes later on trace back to a scope that was vague at the start.
While it runs
- Site attendance at agreed intervals, scaled to the size and pace of the project
- Observation of workmanship and verification of the materials actually used
- Photographic record of work before it is closed up
- Progress tracked against programme, with slippage flagged early rather than explained late
- Written reporting to the owner, in plain language
- Contractor coordination on the owner's behalf, where that is wanted
At the end
A final review before sign-off and before the last payment is released: every quoted item verified as completed, the standard assessed, outstanding items listed, and anything still owed under warranty recorded while there is still leverage to have it put right.
New build, stage by stage
A new build is oversight with a longer horizon and more leverage. Payment is staged against milestones, and each milestone is a point at which the yard needs something from the owner — which is when questions get answered.
- Stage inspections at the points where work disappears — hull lamination or welding, structural bonding, tank testing, machinery and systems installation, and cable and pipe runs before the panels go on
- Yard visits timed to milestones rather than to the calendar, with a written report against the specification each time
- Pre-delivery inspection and snagging, before acceptance and before the final payment is released
- Sea trials attended, with performance and systems checked against what was contracted rather than against what is presented on the day
- The warranty period — defects that appear in the first season documented and pursued while the yard is still obliged to put them right
Post-works inspection
Oversight throughout is the better option, but it is not the only one. Where work is already finished — by a yard you did not choose, under a previous owner, or while you were not there — a post-works inspection establishes independently what was actually carried out, and to what standard.
It earns its cost before a final payment is released, before a warranty period expires, or when buying a vessel whose recent refit forms a large part of the asking price. A refit invoice is a claim about a boat. It is not evidence.
If you are not there
Most owners cannot sit in a yard for three months, and the ones who can usually have better things to do. Remote owners are the normal case, not the exception: regular written updates, photographs of the work as it happens, and a direct line for the decisions that cannot wait. You stay across the project without being on site for it.
How involvement is agreed
Every project is different, so the level of involvement is set at the outset against scope, duration and complexity. A short yard period with a single contractor might mean two or three visits and a written summary. A multi-month refit across several trades means regular attendance, progress reporting and active coordination between the parties.
Get in touch
Make an informed decision
Describe your vessel and situation. Every enquiry is reviewed personally, with a prompt reply recommending the most appropriate next step.
Direct contact
Westmar Surveys
- +34 658 597 597
- Phone
- +34 658 597 597
- Based in
- Palma de Mallorca, Spain
Attending vessels globally - Hours
- Monday to Friday, 09:00–19:00
- Languages
- English · Spanish · French · German
- NIF
- ES Z0508269C
Thomas usually replies within the hour during working hours.